December 2010
1 post
Dec 3rd
5 notes
October 2010
2 posts
Oct 5th
WatchWatch
open house stop motion (updated)
Oct 2nd
17 notes
September 2010
10 posts
Sep 19th
1 note
Sep 14th
1 note
Sep 14th
Sep 14th
1 tag
WatchWatch
saturday, 4th september suzanne lacy, an artist using one of the houses, had her opening today. the house was not lifted today on the plattform as planed. a lot of people were there, visiting, playing music and so on… also… toki bang! the rabbit hutch (farmers storage) is finished! and we still hope to see at least one of the houses getting lifted on the plattform as long as we...
Sep 4th
1 tag
WatchWatch
friday, 3rd september
Sep 3rd
1 tag
WatchWatch
this night there was a taifun in anang, tearing off trees, billboards,etc.. on our building site it riped off the plans and broke down some furniture and plants. nevertheless, we continue. the farmers storage turns out really nice shake (schindel) wall and roof.
Sep 2nd
WatchWatch
1st september
Sep 2nd
Sep 1st
Sep 1st
August 2010
48 posts
1 tag
WatchWatch
open house video openHouse is a project by raumlaborkorea for APAP 2010, Anyang, South Korea,  Matthias Rick with Jia Gu, Florian Stirnemann, Marius Busch and Benjamin Frick in collaboration with Collective Terrain and the citizens of Anyang raumlaborkorea is a temporary intervention unit of raumlaborberlin 
Aug 28th
Aug 28th
WatchWatch
friday, 27th august
Aug 27th
WatchWatch
thursday, 26th august
Aug 27th
Aug 26th
Aug 23rd
1 note
1 tag
WatchWatch
saturday, 21st august the countdown is started: 15 days to the opening (on sunday 5th september) and still a lot to do and to organize. the workshop is doing really well. this afternoon for example 19 persons joined to the workshop. and our personal pride is that the groups were very different:  -6 teenager volunteers (one of them came a few times already) -in bom-vaik (a neighbor who is...
Aug 21st
1 tag
WatchWatch
thursday, 19th august today: same same but different. construction company raised up the tower (not everything as planned..) and our 10 students came for the second day and were twice as effective as yesterday! we built with them together mini-frames for the rabbit house, made the floor for the farmers storage, the shelf and the window frames for the greenhouse.
Aug 19th
Aug 18th
1 tag
WatchWatch
wednesday, 18th august incredible! the construction company started with the steel beams today and beamed the structure up in high speed!! also a lot of highschool students came to build and will come again tomorow. we built with them a shelf in the greenhouse, a mobile table and two chaise bordelaise, and prepared the duck and rabbit drawings for the signs (we will have a little pet farm).
Aug 18th
1 tag
WatchWatch
tuesday, 17th august we didn’t expect so, but the teenagers really love doing the insulation in the houses. i showed them the stop-motion videos that i am doing to explain why there is always a camera. maybe they are watching the movie now..? the info-team helped the mother and the girl that already built 2 children chairs building a small book holder. the girl came to me with a...
Aug 18th
Aug 17th
1 tag
Aug 17th
Aug 16th
Aug 15th
1 tag
WatchWatch
saturday, 14th august the rain is the bane of todays workshop… twice we had to stop and take away all the tools, unplug the cables while water streams flooded the area so that only a small island in the middle of the plazza wasn’t flooded. still we could be productive. this morning, after a difficult start, the new volunteers insulated the front wall of suzanne lacy’s house...
Aug 15th
1 note
1 tag
Aug 14th
1 tag
Aug 13th
Aug 13th
1 tag
WatchWatch
friday, 13th august the workshop began with a group of teenagers (volunteers). they finally built a “chaise bordelaise” and painted the sign for the rabbit house and the view point. also the neighbor who is coming almost every day finished the shelf he is working on since a while. (and by the way he built 2 small stools) after, still a lot of people came: a mother with 4 kids from...
Aug 13th
1 note
1 tag
WatchWatch
thursday, 12th august today was a hyperactive day! 5 volunteers for the building workshop arrived ready on the site before us. together, they built billboards and benches; the adjumas with their kids made pencil cases or just played with the already built wooden toys. others were constructing tables, and the the carpenters finished the inside of the Business Center while the construction company...
Aug 12th
1 tag
WatchWatch
tuesday, 10th august the rain is the workshops bane. but we go on (thanks to the plans) somehow… the gardener came and planted mint. as i asked him if he has a rule where to cut them (the propagates) he told me “there is no rule, my heart tells me how to do it”.
Aug 12th
1 tag
WatchWatch
friday, 6th august today the construction company digged a 2m deep hole with 2 excavators while the carpenters set up the “business center”.
Aug 12th
Aug 12th
Aug 10th
Aug 9th
1 note
2 tags
Aug 9th
Aug 9th
Aug 9th
Aug 9th
Aug 9th
1 tag
Aug 9th
1 tag
WatchWatch
tuesday, 3rd august the carpenters built a lot (!) of frames, we got new wood and the construction company finaly started with the work and set up the fence for their building site. i had some technical problems today with the camera battery, sorry for the cuts… i would have loved to have the part were the construction company set up the fence in the background for example.
Aug 6th
Aug 6th
1 tag
WatchWatch
sarangbang opening
Aug 5th
Aug 5th
Aug 5th
1 note